3 of 1 ·Plan before you build

Lesson 3 · Computational Thinking
Turning a plan into ordered steps.
Breaking Big Problems
Break a big job into smaller jobs. A class poster needs a message, a drawing and a title. Choose one small part you already know how to do.
Click to zoomA list is not yet a planYou have a pile of small tasks. That's progress — but it isn't a plan.
A plan adds two things a list doesn't have:
Without those, you'll start with the fun task, discover it needs three other things first, and stall.
Click to zoomFind what everything else needsLook through your tasks and ask of each one: what must exist before I can do this?
You can't make the basket move before the basket exists. You can't score a catch before the mango falls. You can't show "Game Over" before there's a way to lose.
Tasks that depend on nothing go first. Then tasks that depend only on those. Keep going — this is exactly the sequencing skill from Chapter 2, now applied to a project instead of a sandwich.
7 more parts in this lesson
Walkthroughs, code labs, mini-games and the checkpoint quiz unlock when you buy the course.